Information that improves the first review
- 1Product family, component/kit/development scope and the end application
- 2For sensing: measured directions/range, load path, mounting, signal output and calibration needs
- 3Critical field, force, torque, speed, stroke, duty, and interface requirements as applicable
- 4Envelope, drawings or mating geometry, materials, tolerances, electrical supply, controls, and environment
- 5Project stage, validation and documentation needs, estimated quantity, target timing, and destination
- 6Design/simulation requests, prototype iteration target, and expected pilot-to-volume ramp where known