Buyer input
Application summary, drawings or envelope, operating points, constraints, failure concerns, quantity, and timing.
A custom project progresses through five controlled stages: define the application, compare architectures, qualify the responsible production route, validate representative samples, and confirm the repeat-supply boundary. Facility, process, evidence, timing, quantity, and commercial commitments remain project-specific.
Magatom provides the buyer interface, requirement record, and cross-party coordination. It does not convert an early category match into an unverified factory, process, certification, equipment, capacity, minimum-order, performance, or lead-time promise.
Each project identifies the responsible supply route, approved revision, validation conditions, records, packaging, change authority, and commercial commitments before controlled release.
Five project stages
Translate the equipment need into measurable field, force, motion, interface, environment, duty, and life requirements.
Application summary, drawings or envelope, operating points, constraints, failure concerns, quantity, and timing.
A requirement summary with assumptions, missing inputs, contradictions, and critical-to-quality items.
Evaluate architecture, material, geometry, winding, drive, retention, transmission, protection, and sourcing directions against the requirement.
Fixed interfaces, flexible choices, target priorities, incumbent reference if available, and unacceptable trade-offs.
Available directions, trade-offs, evidence gaps, project risks, and questions requiring confirmation.
Match the requirement to a specialist production route, then review process assumptions, inspection access, documentation, capacity, and supply risk.
Required processes, compliance or documentation needs, volume range, timing, destination, quality expectations, and approved-source constraints.
A proposed responsible route with open capability evidence, feasibility questions, DFM items, and project-specific confirmation needs.
Agree how a prototype or candidate will be measured under defined application conditions before treating performance as established.
Acceptance thresholds, test conditions, sample plan, fixtures, measurement method, documentation, and system responsibility.
A staged validation plan with revision identity, conditions, results, deviations, and an acceptance decision.
Freeze the approved revision, critical interfaces, acceptance records, change process, packaging, and commercial assumptions.
Approved drawing/specification, forecast or order quantity, destination, packaging needs, quality records, and change authority.
A project-specific release and repeat-supply boundary with approved evidence, responsibilities, change rules, and commercial commitments.
Responsibility matrix
The customer-facing definition and project record.
The cross-party work needed to turn a requirement into a controlled route.
The manufacturing and commercial commitments supported by the selected route.
Send the current drawing or envelope, function, critical outputs, interfaces, operating conditions, required records, quantity, target timing, and destination. Identify what is fixed and what may change.
An initial review identifies missing inputs and next steps. It does not by itself confirm feasibility, performance, price, or delivery timing.